top of page

arrakis trimble point layout

Year Awarded - 2020
 Client - Nappa Electrical Contractors
Location - Waltham, MA

Project Description:  This project consisted of Electrical Trimble Layout of electrical fixtures and devices within the 45,000sf of renovation office/LAB space in scope.

Project Scope:  

This project included Electrical Trimble Layout for: 

•    All Fire Alarm Devices
•    All Ceiling Utility Panels
•    All 1st/2nd Floor Power Devices
•    ALL Emergency Lighting 
•    One Quarter of all Lighting so that rows and columns can be laid out in field easily
•    All Floor Boxes, poke throughs and Furniture Feeds.
•    All Electrical Panels within the tenant space 

 

bottom of page