top of page

LAWRENCE HALL RENOVATION AT LESLEY COLLEGE

Add a Title
Add a Title
Add a Title
Add a Title
Add a Title
Add a Title

2022

Project Description:  

Project Scope:  

Year Awarded:

Client:

Cambridge, MA

Location: 

Hankard Electric

This project consisted of renovation to several locations on the same floor
totaling approximately 1,200 square feet within the existing building.

The scope included reworking and upgrading of the existing Electrical Distribution Equipment
to accommodate the new electrical renovation scope

This project included preparation of construction drawings and specifications for building electrical systems including modifications to the existing addressable speaker/strobe voice evacuation fire alarm system. LED lighting and associated branch wiring, emergency and exit egress lighting, automatic lighting control, mechanical systems power, electrical load calculations, electrical service rework design and power distribution

bottom of page