top of page

MILTON LIBRARY AND TUCKER ELEMENTARY
![]() | ![]() | ![]() | ![]() |
|---|---|---|---|
![]() | ![]() |
2025
Project Description:
Project Scope:
Year Awarded:
Client:
Milford, MA
Location:
Guardian Energy Management Solutions
This project was a Facility Assessment of two educational buildings for the town of Medford. First we reviewed the existing electrical systems conditions of the Milton Library then we reviewed the Tucker Elementary School.
The scope was to review the existing electrical distribution and metering and make recommendations on how to add a optional standby generator to each building that currently have no generator back up power. Generator sizing was based on the current utility bills provided for calculations.
bottom of page





