top of page

LITCHFIELD SCHOOL RENOVATIONS

Add a Title
Add a Title
Add a Title
Add a Title
Add a Title
Add a Title

2021

Project Description:  

Project Scope:  

Year Awarded:

Client:

Litchfield, NH

Location: 

Windy Hill Associates

This project consists of lighting, power and electrical distribution system upgrades to the
Litchfield Middle School in Litchfield, New Hampshire. It is our understanding that the building
square footage is approximately 67,500 sq. ft.

ESE provided schematic design, design development, construction documents, bid sets, and permit sets including all electrical systems both for the newly constructed building as well as all site electrical work pertaining to the building. Electrical systems designed included addressable audio-visual fire alarm systems, LED lighting/branch wiring (normal, emergency, egress, and automatic controls), power distribution (normal, mechanical, and emergency), electrical load calculations, new electrical service, receptacles, telecommunications, and conduit sleeves. All lighting systems were either DLC listed or Energy Star approved and a mix of vacancy and occupancy sensors were utilized in common spaces for energy conservation. Additionally, a video intercom system was provided in each unit with a master station located at the ground floor entrance for security.

Site electrical work included primary and secondary work, communication service provider empty pathways, fire alarm, and lighting. Additionally, it also included two (2) Electric Vehicle charging stations (level II) as well as PV Solar provisional space in distribution for future PV Roof System.

© 2023 by Sphere Construction. Proudly created with Wix.com

bottom of page